ABI-KEY-0103
Access controlNorthridge
Llave del Taller de la Planta de aguas residuales
Llave del taller en el primer piso de la Zona de trabajo 1 de la Planta de tratamiento de agua en la Cresta Norte. Dentro hay algunos armeros.
—Sin verificar45 uses
Is it worth buying
Veredicto
Datos insuficientes
- Purchase
- 350KKoen
- Break-even
- Sin verificar
Estimated, not measured
Expected value
Purchase price350.000Market average
Value per useSin verificarReported average yield
Valor totalSin verificarAcross 45 uses
ROI ratioSin verificarLifetime value ÷ price
Community verified · confidence medium
Estimate — how this number is produced
- No average run yield recorded for this key — value cannot be estimated.
- Assumes every run extracts successfully — no risk discount is applied.
- Excludes the cost of the loadout taken into the raid.
Sewage Plant Workshop
Tras la puerta

- Home Toolbox×1
- Pro Toolbox×1
- Safe×1
Tactical notes
Aproximación y extracción
Key to the Workshop on the first floor of Sewage Plant Work Area 1 in Northridge. There are some workbenches inside.
Lista de cambios
Historial de parches
No recorded changes across the patches in the database.
Derivado de las relaciones de la base de datos
